July 14, 2018

AJB Industrial Project for Aqaba LNG Terminal Project (Sheik Sobah Terminal)

Owner: Ministry of Energy and Mineral Resources
Consultant: ILF Consulting Engineers
EPC Contractor:  OHL – MID Joint Venture

AJB supplied Sheik Al. Sobah Terminal in Aqaba with Honeywell Gas Metering Skids including gas flow meters, gas chromatographs, piping and fabrication of the skids.

 

AJB also undertook the programming of the Logic Controller to communicate with 12 different systems and consolidated them into the SCADA (Supervisory Control & Data Acquisition) station.


System Architecture

All instrumentation including pressure, temperature, flow and level transmitters were supplied by AJB as well.

Finally, all manual valves of the project were provided by AJB including four 24” manual ball valves.